Tottori Dam construction three-surface channel construction (743)

Tottori Dam construction three-surface channel construction (743)

    Location
    Tottori prefecture (Chuugoku area)
    Product/Material
    Cloth formwork "TACOM" Standard type 300H
    completion of construction
    September 2011
    scale
    282 square meters
  • TOP>
  • Projects>
  • Tottori Dam construction three-surface channel construction (743)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.