Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater "No.1" in 2014.
Receipt and removal of construction soil generated from the reclamation of the new sea-level disposal site and the outer side of the central breakwater “No.1” in 2014.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.