Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)

Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)

    Location
    Fukuoka prefecture (Kyushu)
    Product/Material
    Continuous box-type steel frame "MAXWALL" MW-1350
    completion of construction
    October 2017
    scale
    300m
  • TOP>
  • Projects>
  • Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.